Kajian Produktivitas Instalasi Rangka Atap Baja Ringan: Studi Kasus di Bandung, Indonesia
Abstract
The needs of housing in Indonesia is increasing in conjunction with the population growth. This increment has to be addressed by an efficient construction process, which includes an adequate material and construction method selection. The utilization of light steel roof trusses is as an innovation which is considered better in terms of cost, time, and quality, com- pared to a conventional wood roof trusses. This research is aimed to identify the productivity of light steel roof trusses installation. The case study is a housing project in Bandung, which is compared to a historical data from several light steel roof subcontractors within Bandung area. The productivity from the direct observation on the case study is 9.821 m2/man-day, while the historical data processing generates 7.355 m2/man-day. This different is resulted from the ineffective working time. The ineffective working time covers worker’s break time, learning curve, and coordination time. Besides, this different could also be caused by the 7 hours’ assumption on the daily working hour. This assumption is not thoroughly achieved due to several factors which are weather and daily working efficiency. In conclusion the conservative value of the light roof steel trusses installation productivity is 7.355 m2/man-day.
References
Fahirah, F., 2011. Identifikasi Variabel PenilaianProperti Perumahan berdasarkan Persepsi Penghuni Perumahan. SMARTek, 9(4), pp. 257-270.
Julianto, P. A., 2016. Hingga 2025, Kebutuhan Rumah di Indonesia Tembus 30 Juta Unit. [Online] Tersedia pada: https://ekonomi.kompas.com/read/20 16/09/17/195151226/hingga.2025.ke butuhan.rumah.di.indonesia.tembus.30.juta.unit [Diakses pada 6 11 2018]
Kurniawan, T. Y., 2017. Kebutuhan Rumah Per Tahun Capai 1,4 Juta Unit.[Online] Tersedia pada: https://www.wartaekonomi.co.id/rea d161810/kebutuhan-rumah-per- tahun-capai-14-juta-unit.html [Diakses pada 6 11 2018]
Ditjen Penyediaan Perumahan, 2016. Data Perumahan BPS Harus Dijadikan Acuan. [Online] Tersedia pada: http://perumahan.pu.go.id/ditpnp/beri ta/show/61 [Diakses pada 06 11 2018].
Kementerian Keuangan RI, 2017. Program Satu Juta Rumah Berlanjut di Tahun 2017. [Online] Tersedia pada: https://www.kemenkeu.go.id/publika si/berita/program-satu-juta-rumah-berlanjut-di-tahun-2017/[Diakses pada 6 11 2018].
Hassan, H., Mangare, J. B. & Pratasis, P. A. K., 2016. Faktor-Faktor Penyebab Keterlambatan pada Proyek Konstruksi dan Alternatif Penyelesaiannya (Studi Kasus: Di Manado Town Square III). Jurnal Sipil Statik, 4(11), pp. 657-664.
Husnah, Basri, D.R., Nureb, D., 2017. Pengaruh Manajemen Pengendalian Material dalam Mencegah dan Mengatasi Keterlambatan Proyek Bangunan di Madrasah Aliyah Kejuruan (Mak) Rokan Hulu. Jurnal Rab Construction Research 2 (2), pp.265-283.
Widhiawati, I. R., 2009. Analisis Faktor- Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi. Teknologi Elektro, 8(2), pp. 109-114.
Ariyanto, A.S., Kamila, K.A.P., Supriyadi, Utomo, M.B., Mahmudi, W.L., 2019. Pengaruh Keterlambatan Material Terhadap Risiko Proyek Pembangunan Gedung Parkir. Bangun Rekaprima, 5(2), pp.51-58.
Oktarina, D. dan Darmawan, A., 2015. Analisa Perbandingan Rangka Atap Baja Ringan dan Rangka Atap Kayu dari Segi Analisis Struktur dan Anggaran Biaya’ Jurnal Konstruksia 7(1), pp.27-36.
Rahayu, S. A. & Manalu, D. F., 2015. Analisis Perbandingan Rangka Atap Baja Ringan dengan Rangka Atap Kayu terhadap Mutu, Biaya, dan Waktu. Fropil, 3(2), pp. 116-130.
Anggawisastra, R., Sutalaksana, I. & Tjakraatmadja, H., 1979. Teknik Tata Cara Kerja. Bandung: Institut Teknologi Bandung.
Copyright (c) 2020 Jurnal Ilmiah Rekayasa Sipil
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.