ANALISIS PENINGKATAN WAKTU PELAYANAN PRODUKSI KENDARAAN BERMOTOR RODA DUA PADA PERUSAHAAN MANUFAKTUR

Authors

  • Hernadewita Hernadewita Sekolah Tinggi Manajemen Industri Departemen Perindustrian dan Perdagangan R.I
  • Hendra Hendra Jurusan Teknik Mesin Universitas Bengkulu

Keywords:

Cycle Time, automatic guided vehicle (AGV), Escalator

Abstract

The consumption motorcycle is the high. This is because people need the transportation and which the transportation cost expensive (by Bus, Car). For the consummate to need people a motorcycle, manufacturing company to production motorcycle, to make product with low cost and fast cycle time. This is doing with the large production area or new fabrication. With the improve a cycle time is the design to automatic system production example: to make use of AGV, Escalator, Lift etc, can be minimize to cost production and large production area. Results the calculated, the minimize cycle time and its time can be use for area shipping.

References

1. Agus Nugroho Eko dkk, “Perancangan Lay Out Pabrik” Program Magister Teknik Mesin,bInstitut Teknologi Bandung, 2002.
2. Federal Motor Indonesia - Institut Teknologi Bandung, “System Operation For Assembling Area - Design of Operating System”, 1996.
3. Setyadi R, Sistem Operasi AS/RS, Federal Motor Indonesia-Institut Teknologi Bandung, 1998.
4. Yuwana M.M, Yatna, Perencanaan Produksi, Program Pascasarjana Departemen Teknik Mesin Institut Teknologi Bandung.
5. Yuwana M.M, Yatna, Perancangan Pabrik, Program Pascasarjana Departemen Teknik Mesin Institut Teknologi Bandung

Downloads

Published

2020-03-10

How to Cite

Hernadewita, H., & Hendra, H. (2020). ANALISIS PENINGKATAN WAKTU PELAYANAN PRODUKSI KENDARAAN BERMOTOR RODA DUA PADA PERUSAHAAN MANUFAKTUR. Jurnal Teknik Mesin, 1(2), 76–81. Retrieved from http://ejournal2.pnp.ac.id/index.php/jtm/article/view/320

Most read articles by the same author(s)