[1]
Muchtar, R. and Leonanda, B.D. 2022. Evaluasi Pelaksanaan Overhaul Pabrik Indarung VI Pada Masa Pandemu di Tahun 2020. Jurnal Teknik Mesin. 15, 1 (Jul. 2022), 46-54. DOI:https://doi.org/10.30630/jtm.15.1.799.