Rancang Bangun Pembangkit Listrik Pikohidro Menggunakan Turbin Screw Pada Aliran Danau PCR

  • Jupri Yanda Zaira Program Studi Teknik Mesin, Jurusan Teknologi Industri, Politeknik Caltex Riau
  • Oloan Rinaldi Naibaho Program Studi Teknik Mesin, Jurusan Teknologi Industri, Politeknik Caltex Riau
Keywords: picohydro, screw turbine, PCR Lake flow

Abstract

Picohydro is a power plant that produces 5 kW of power which consists of 3 components, namely air flow, turbine, and generator to convert maximum energy into electrical energy. Picohydro is an alternative power plant as a substitute for fossil fuel power plants (diesel and gasoline). The PCRlake flow has a flow of 0.019 m3/s which can be used as a potential source of energy to generate electricity, where the tools used are screw turbines, V-belt transmission, and DC generators. The results of the design of the screw turbine that are made have a turbine length specification of 1,140.5 mm, an outside diameter of 419.4 mm, an inside diameter of 225 mm, a turbine pitch of 503.2 mm, a number of blade turns 2 pieces, a turbine angle of 26o, a thread angle of 21o, and a head of 0.5 m. For the transmission, there are 2 type A -V belts that connect the turbine rotation to the DC generator rotation. The results obtained that the theoretical power available in the PCR lake flow is 95.01 watts. The average rotation produced by the 1,398 rpm generator is able to stably turn on as many as 6 DC lamps with a total load of 60 watts. By testing the DC lamp load, a total load of 60 watts produces a generator power of 29.14 watts, a screw turbine power of 34.08 watts. By testing using a braking system at turbine rotation it produces a maximum torque of 13.12 Nm with a screw turbine power of 46.70 watts and a turbine mechanical efficiency of 49.16%.

References

Kebtke, p. (2020). Peta Potensi Energi Hidro Indonesia 2020. [Online](Update 20 nov 2021) Tersedia di :https://p3tkebt.esdm.go.id/news-center/arsip-berita/peta-potensi-energi-hidro-indonesia-2020.[Accessed 6 Januari 2021]

BP Statistical Review Of World Energi. (2022). Statistical Review of World Energy 2022. [Online](Update 1 mar 2022) Tersedia di: https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/energy-economics/statistical-review/bp-stats-review-2022-full-report.pdf.[Accessed 9 April 2022]

S, H. A., & Dinahkandy, I. (2018). Studi Pemanfaatan Energi Matahari Sebagai Sumber Energi Alternatif Terbarukan Berbasis Sel Fotovoltaik Untuk Mengatasi Kebutuhan Listrik Sederhana di Daerah terpencil. Jurnal Teknik Mesin UNISKA, 03(02), pp.88-93.

Utari, E. L., Mustiadi, I., & Yudianingsih. (2018). Pemanfaatan Energi Surya Sebagai Energi Alternatif Pengganti Listrik Untuk Memenuhi Kebutuhan Penerangan Jalan di Dusun Nglinggo Kelurahan Pagerharjo Kecamatan Samihgaluh Kabupaten Kulon Progo. Jurnal Pengabdian Dharma Bakti, 01(02), pp.90-99.

Arlianti, L. (2018). Bioetanol Sebagai Sumber Green Energy Alternatif yang Potensial di Indonesia. Jurnal UNISTEK, 05(01),pp.16-22.

Prasetyo, J. (2018). Studi Pemanfaatan Minyak Jelantah Sebagai Bahan Baku Pembuatan Biodiesel. Jurnal Ilmiah Teknik Kimia, pp.1-10.

Aklis, N., Riyadi, M. A., Rosyadi, G., & Cahyanto, W. T. (2015). Studi Eksperimen Konversi Biomassa menjadi SynGas Pada Reaktor Bubbling Fluidized Bed Gasifier. Seminar Rekayasa Teknologi Industri dan Informasi (ReTII-15) (pp. 973-978). Yogyakarta: Institut Teknologi Nasional Yogyakarta.

BPS-Indonesia. (2019). Konsumsi Listrik per kapita (MWH/Kapita). [Online](Update 18 jun 2021).Tersedia di: https://www.bps.go.id/indicator/7/1156/1/konsumsi-listrik-per-kapita.html.[Accessed 20 Jul 2021]

Iskana, F. R. (2016). Ada 12.659 desa tertinggal belum terakses listrik. [Online](Update 5 agu 2021) Tersedia di:https://industri.kontan.co.id/news/ada-12659-desa-tertinggal-belum-terakses-listrik.[Accessed 15 Jul 2021]

Zaira, Wijianto, & Syahrizal. (2020). Pemanfaatan Potensi Aliran Danau PCR Untuk Pembangkit Listrik Pikohidro Menggunakan Turbin Crossflow. Jurnal Inovtek Polbeng, pp.148-154.

Encu Saefudin, T. K. (2017). Turbin Screw Untuk Pembangkit Listrik Skala Mikrohidro Ramah Lingkungan. Jurnal Rekayasa Hijau, I(3), pp.233-234.

IR.Sularso, M. (2004). Dasar Perencanaan dan Pemilihan Elemen Mesin. Jakarta: PT.Pradnya paramita.

White, F. M. (2011). Fluid Mechanics (7rd ed.). New York: McGraw-Hill.

Nagel, G. (1968). Archimedian Screw Pump Handbook. Nu¨rnberg, Germany: Ritz Pumpenfabrik OHG.

Rorres, C. (2000). The Turn Of The Screw:Optimal Design Of An Archimedes Screw. Journal Of Hydraulic Engineering, pp.74-80.

Jewet, S. (2010). Pisika Untuk Sains dan Teknik (Fhysics for Scientists and Engineering with Modern Physics) (6rd ed.). Jakarta: Salemba Teknika.

Dietzel, F., & Sriyono, D. (1993). Turbin, Pompa dan Kompresor. Jakarta: Erlangga.

Published
2023-06-01
How to Cite
Zaira, J., & Naibaho, O. (2023). Rancang Bangun Pembangkit Listrik Pikohidro Menggunakan Turbin Screw Pada Aliran Danau PCR. Jurnal Teknik Mesin, 16(1), 1-8. https://doi.org/10.30630/jtm.16.1.851